London Borough of Hackney

William Patten Primary School, London

Classification

Conservation Area

Summary of Works

Overall Description of Works

The works comprised DOFF steam cleaning to the masonry façades using appropriate conservation techniques, together with the selective replacement of deteriorated facing brickwork carefully matched to the existing in colour, texture and bond.

Gauged brick arches were designed, manufactured and installed to replicate the original architectural detailing, alongside the design, supply and installation of new natural stone elements to cornices, window heads and cills to match the existing profiles. Structural masonry repairs and strengthening works were also undertaken, including the careful dismantling and rebuilding of a gable.

New leadwork was installed to stringcourses and flashings in accordance with traditional detailing and best conservation practice. The works further included the overhaul and decoration of rainwater goods (RWPs) to ensure continued performance and visual consistency with the historic fabric, together with underground drainage surveys and associated repair works to identify and rectify defects within the drainage system.